Flood Insurance Terms & Concepts · Claims

Replacement Cost vs. Actual Cash Value in Flood Claims

How NFIP claims are valued, why the 80% insurance-to-value rule matters for primary homes, and why contents are paid at depreciated value.

Plain-English guideSources: FEMA & NFIPLast reviewed: Nov 2026

Key points

  • Replacement cost value (RCV) = cost to rebuild with like materials, no depreciation.
  • Actual cash value (ACV) = replacement cost minus depreciation.
  • Under the NFIP Dwelling Form, a single-family principal residence gets replacement-cost settlement if it is insured to at least 80% of replacement cost or the maximum available.
  • Otherwise, and for personal property, losses are generally settled at ACV.

Two ways to value a loss

FEMA defines actual cash value as the cost to replace an item at the time of loss, less physical depreciation, and replacement cost value as the cost to replace with the same kind of material and construction without a depreciation deduction. The gap between the two can be large on an older home.

The 80% rule for primary homes

The Dwelling Form gives replacement-cost settlement for a single-family dwelling that is your principal residence when, at the time of loss, your building limit is at least 80% of the full replacement cost — or the most insurance the NFIP offers for that building, whichever is less. Fall short, and the claim is typically settled on an ACV basis.

"Principal residence" has a specific meaning in the policy: you or your spouse must have lived there for at least 80% of the 365 days before the loss (or of your ownership period if shorter).

Contents and other buildings

Personal property is generally valued at ACV under the NFIP. Second homes, rentals and other buildings that do not meet the replacement-cost conditions are also usually paid at ACV. Some private flood policies offer replacement cost on contents — compare policy language.

Repair first, then the rest

For replacement-cost claims above certain amounts, the policy can hold back part of the payment until repairs or replacement are completed. Keep receipts and contractor invoices.

This article is general information, not policy advice. Your policy documents and declarations page control your coverage. Program rules change; check the sources below for the latest.

Related concepts

CoverageBuilding vs. Contents Coverage: What Each Part of a Flood Policy Pays ForFlood policies split coverage into the structure (building) and your belongings (contents). Here is what falls on each side and why you may need both.ClaimsFiling a Flood Claim and the 60-Day Proof of Loss DeadlineThe steps after a flood, what documentation to gather, and why the sworn proof of loss deadline matters.PricingFlood Insurance Deductibles: How They Work and How to ChooseSeparate deductibles for building and contents, typical NFIP options, and how a higher deductible trades premium for out-of-pocket risk.